Sample run on public documents

Board packets in, agreement records out, every fact tied to its page

Two real school board packets from different districts, read end to end: who provides the after-school program, which schools it covers, what each school is allocated, the term, and whether the board approved it.

458pages across 2 packets
11 of 11school-to-amount links verified
25facts, each with a source page
$0.65total model cost for both
1Read every page

Per-page text with the table layout kept, so columns stay lined up and page numbers match the PDF.

2Find the agreement

A small model sorts the whole packet and keeps only the pages that belong to the agreement, its exhibits and the approval.

3Extract with citations

A stronger model fills a fixed record. Every fact carries its page number and a quote copied from that page.

4Check, don't trust

No model involved: quotes must exist on the cited page, school amounts must add up, and each table is re-read from the page image.

Oakland Unified School District × Safe Passages

Board packet item 22-1495 · meeting of June 29, 2022 · source PDF ↗

417pages in packet
→
46pages kept
→
6schools linked
→
$0.42to process

Agreement record

ProviderSafe Passagesp. 1✓
ProgramExpanded Learning Programs After School Program (ASES, 21st Century, ELO-P lead agency services at six OUSD sites)p. 1✓
Agreement total$6,942,119.00p. 4✓
Term startsJuly 1, 2022p. 3✓
Term endsJuly 31, 2025p. 3✓
FundingResource 6010 ASES ($2,136,569.00); Resource 4124 21st Century ($1,042,050.00); Resource 2600 ELO-P ($3,763,500.00)p. 1✓
Board approvalApproved 6/29/2022p. 1✓

Schools and amounts 6 of 6 verified

SchoolAmountSourceChecks
Chabot Elementary$600,000.00p. 22✓◉
Coliseum College Prep Academy$2,048,948.52p. 22✓◉
Fruitvale Elementary$1,057,836.39p. 22✓◉
Laurel Elementary$1,057,836.39p. 22✓◉
MetWest High$763,500.00p. 22✓◉
United for Success Academy$1,413,998.52p. 22✓◉
Σ schools = $6,942,119.82 · $0.82 over the agreement total of $6,942,119.00 → flagged

Flagged for a reviewer

  • Exhibit A per-school amounts sum to $6,942,119.82 (matching the table total), but the not-to-exceed amount on the cover memo (p.1) and in Section 6 (p.4) is $6,942,119.00, and the three funding resources on p.1 also sum to $6,942,119.00 — a $0.82 discrepancy.
  • Exhibit A amounts are labeled 'Projected Three Year Grant' while the heading says 'Annual Grant Amounts'; no per-year per-school breakdown is given.
  • Exhibit B (p.23) and Exhibit D (p.44) contain only 'INSERT HERE' placeholders; Exhibit E and packet pages 45-53 are not included.
Source page 22hover a fact or a school to see where it was read
Source page
On this packetWhole packet in one prompt ($0.17)This pipeline ($0.42)
School-to-amount links6 of 6 correct6 of 6 correct, each verified
Source page for each factNoneEvery fact, quote checked against the page
Board approval“Not shown in the packet”Approved 6/29/2022, cited to p. 1
Table total vs. contract totalNoticed, reported as an “18-cent difference”Flagged: table sums to $0.82 over the contract amount

San Diego Unified School District × Good Sports Plus, Ltd dba Arc

Agreement PS22-0073-37 · board meeting of September 14, 2021 · source PDF ↗

41pages in packet
→
29pages kept
→
5schools linked
→
$0.23to process

Agreement record

ProviderGood Sports Plus, Ltd dba Arcp. 1✓
ProgramIMIN Program 21st Century After-School Safety and Enrichment for Teens (ASSETs)p. 16✓
Agreement total$787,500.00p. 23✓
Term startsJuly 1, 2021p. 23✓
Term endsJune 30, 2022p. 23✓
FundingASSETs grant (21st Century After-School Safety and Enrichment for Teens); recital states services are funded in whole or in part by a state or federal grantp. 16✓
Board approvalApproved 9/14/2021p. 15✓

Schools and amounts 5 of 5 verified

SchoolAmountSourceChecks
Crawford High School$175,000.00p. 23✓◉
Garfield High School$87,500.00p. 23✓◉
Hoover High School$175,000.00p. 23✓◉
Lincoln High School$175,000.00p. 23✓◉
San Diego High School$175,000.00p. 23✓◉
Σ schools = $787,500.00 · matches the agreement total

Flagged for a reviewer

  • The pricing table on page 23 is misaligned in the extracted text; per-school amounts were assigned by row order (attendance goals 25,000 / 12,500 / 25,000 / 25,000 / 25,000 at $7.00 = $175,000 / $87,500 / $175,000 / $175,000 / $175,000). Verify against the original PDF that Garfield is the $87,500 (12,500 attendance) row and that San Diego High's $175,000.00 is correct, since no amount appears on San Diego High's own text line. Resolved in step 4: the page image shows all five amounts, including San Diego High’s $175,000.00.
  • Exhibit A lists participating high schools as 'included, but not limited to' the five named, so other sites could be served.
  • Agreement kind is unclear: the provider has served the District for the past 11 years, but the packet does not state whether this contract is a renewal of a prior agreement.
Source page 23hover a fact or a school to see where it was read
Source page
On this packetWhole packet in one prompt (under $0.01)This pipeline ($0.23)
School-to-amount links5 of 5 correct5 of 5 correct, each verified
Source page for each factNoneEvery fact, quote checked against the page
San Diego High’s amount (missing from the PDF’s text layer)Filled in by subtracting from the totalRead from the page image and confirmed

What this shows

On clean, text-based packets the extraction itself is not the hard part. A single prompt over the whole packet also linked every school to its amount here.

What it could not do is show where each number came from, notice that it had filled a gap by arithmetic, or settle whether the board approved. Those are the parts a product that says “open the source page and verify” depends on.

What this sample does not handle yet

  • Scanned pages. 21 pages of the Oakland packet have no text layer. None were part of this agreement, so no OCR was needed; many packets will not be that kind.
  • Amendments. A later addendum that changes a total or adds a school lives in a different meeting’s packet and has to be joined to this record.
  • Approval recorded elsewhere. When the vote is only in the minutes of a later meeting, one packet cannot answer it.
  • Several agreements in one packet. This run takes the largest one.
  • Two documents are not a benchmark. Accuracy on unseen packets needs a labeled test set, which is the first thing worth building.